1. Polyester color steel tile (PE) roofing hseet has good adhesion, a wide range of formability and outdoor durability, medium chemical resistance, and a service life of 7-10 years.
2. Silicon modified resin roofing tile (SMP) coating film has good hardness, wear resistance and heat resistance, as well as good external durability and non-pulverization, limited gloss retention and flexibility, and has a service life of 10 -15 years.
3. High weather-resistant polyester color steel tile (HDP) has excellent UV resistance and high durability. Its main performance is between polyester and fluorocarbon, and its service life is 10-15 years.
4. Polyvinylidene fluoride color steel tile (PVDF) ppgi roofing sheet has good formability and color retention, excellent outdoor durability and pulverization, solvent resistance, limited color, and a service life of 20-25 years.

How to waterproof color steel tile roof?
1. Before laying the slabs, clean the touch surface first, lay the slabs evenly and stably. The gaps between slabs should be compacted with debris of the same material, and the adjacent slabs should be consistent.
2. Before laying the slag, find a slope of 2% according to the low requirements of the drawing, and the thin part is 20mm. The construction sequence is to start from one end and push to the other end. It should be vibrated and compacted, and the surface should be smoothed.
3. The insulation layer of the exhaust hole should be set with a 6mx6m exhaust channel, and holes should be drilled in the structural layer and the insulation layer to facilitate exhaust.

4. Find the rules according to the slope of the layer, clean the base layer, and tick and sweep the protruding base hard blocks.
5. Before construction, wet the base layer with water, but do not water too much. The base layer is completely wet and the surface is free of water.
6. Paste the ash cake according to the shallowness of the slope, flush the ribs along the drainage direction, and set up the grid joints according to the position of the exhaust duct.
7. Large-area plastering should be done by laying mortar according to the red rib, and scraping it with a wooden trowel to check the smoothness.
8. Before the mortar is solidified, press it twice with an iron trowel to level and compact it. The leveling layer should be maintained. Before maintenance, ≥7 days, wait for the base layer to dry, and then carry out the waterproof construction of the coil material.
9. The first thing for the construction of color steel tiles is that the materials entering the site must have the manufacturer's factory quality certificate or test report. Construction personnel entering the site must undergo professional training, and special types of work must be certified.
10. Before construction, the construction unit must declare the construction plan, and the construction shall not be started without the construction plan.

How to waterproof color steel tile roof ?
1. Before laying the slabs, clean the touch surface first, lay the slabs evenly and stably. The gaps between slabs should be compacted with debris of the same material, and the adjacent slabs should be consistent.
2. Before laying the slag, find a slope of 2% according to the low requirements of the drawing, and the thin part is 20mm. The construction sequence is to start from one end and push to the other end. It should be vibrated and compacted, and the surface should be smoothed.
3. The insulation layer of the exhaust hole should be set with a 6mx6m exhaust channel, and holes should be drilled in the structural layer and the insulation layer to facilitate exhaust.

4. Find the rules according to the slope of the layer, clean the base layer, and tick and sweep the protruding base hard blocks.
5. Before construction, wet the base layer with water, but do not water too much. The base layer is completely wet and the surface is free of water.
6. Paste the ash cake according to the shallowness of the slope, flush the ribs along the drainage direction, and set up the grid joints according to the position of the exhaust duct.
7. Large-area plastering should be done by laying mortar according to the red rib, and scraping it with a wooden trowel to check the smoothness.
8. Before the mortar is solidified, press it twice with an iron trowel to level and compact it. The leveling layer should be maintained. Before maintenance, ≥7 days, wait for the base layer to dry, and then carry out the waterproof construction of the coil material.
9. The first thing for the construction of color steel tiles is that the materials entering the site must have the manufacturer's factory quality certificate or test report. Construction personnel entering the site must undergo professional training, and special types of work must be certified.
10. Before construction, the construction unit must declare the construction plan, and the construction shall not be started without the construction plan.


Post time: May-17-2022
  • Last News:
  • Next News:
  • body{-moz-user-select:none;}